PROJECT KIN-NEON

Build your own community.

An Indigenous-led delivery system designed to help Aboriginal organisations turn land, funding and local capability into the housing and community infrastructure they determine they need.

Land+Funding+Local peopleCommunity-controlled delivery
A remote Australian community building compressed earth block homes together
01

Homes and capability together
Local production, construction, learning and community infrastructure.

Land+Funding+Local peopleCommunity-controlled delivery
THE MODEL

The organisation remains the client and decision-maker.

Kin-Neon is being developed as the delivery package underneath the legitimate funding and governance structure already available to the community.

COSTED TO WHAT IS AVAILABLE

Start with the resources.
Then determine what they can deliver.

A community may prioritise homes, an Elders facility, water infrastructure, local production capability—or a different combination. Kin-Neon's role is to turn those priorities into one coordinated and testable delivery plan.

COMMUNITY INPUTS
LandSite, context and constraints
CapitalAvailable and eligible funding
PrioritiesWhat the community determines it needs
A costed community build plan

A REPEATABLE PATHWAY

01

Listen

Start with the land, available capital and priorities determined by the organisation.

02

Plan

Work backwards from the available resources to a practical, costed community build plan.

03

Configure

Bring together the right mix of design, site works, plant, materials, training and infrastructure.

04

Build capability

Develop local production and construction capability alongside the physical assets.

05

Deliver and learn

Build in stages, verify quality and carry the learning into the next community-led project.

ONE CONNECTED DELIVERY SYSTEM

Designed around the whole build—not one product.

The Kin-Neon framework brings the key components into a coordinated sequence. Each component remains subject to its own engineering, testing, approval and site requirements.

Concept overview of the Kin-Neon foundation geometry system
01 / SITE

Predefined foundation geometry

A proposed kit-of-parts approach to repeatable layout, footing positions and first-row alignment.

Download overview PDF
Concept overview of the Kin-Neon modular roof frame
02 / ENVELOPE

Modular roof frame

A modular timber-and-steel connector concept intended to simplify alignment and assembly.

Download overview PDF
Development concept for a distributed Kin-Neon house sensor system
04 / FUTURE LAYER

Long-term building intelligence

A development concept for low-maintenance monitoring of moisture, movement, utilities and safety. This is a future system direction, not a current deployed capability.

Download overview PDF
Kieran Shirey holding a freshly made compressed earth block beside production equipment

WHY THIS MATTERS

“This is single-handedly the most interesting real life application of STEM you will ever see.”
Kieran ShireyProject Kin-Neon

WHAT THE MODEL IS DESIGNED TO SUPPORT

More than a completed building.

01
PLACE

Housing

Homes configured around local priorities rather than a predetermined catalogue.

02
TOOLS

Capability

Plant, training and repeatable systems that can remain useful beyond one build.

03
PEOPLE

Employment

A pathway for local participation in production, construction and ongoing maintenance.

04
DIRECTION

Choice

A delivery package shaped around the community's land, funding and decisions.

FROM ANCIENT PRINCIPLE TO AN AUSTRALIAN SYSTEM

The idea is being built course by course.

Kin-Neon did not begin with a machine. It began with a question: how could a material principle that has served communities for generations be combined with modern engineering to make quality housing simpler, safer and more repeatable?

  1. COMPLETED
    01

    The question that started it

    Ancient earthen settlements in the Middle East showed how local material could create beautiful buildings that sheltered generations.

  2. COMPLETED
    02

    Finding the modern method

    Research led to Hydraform and the machinery, soil testing and production controls behind modern interlocking compressed-earth construction.

    Hydraform Academy
  3. COMPLETED
    03

    Learning from the source

    Kieran completed Hydraform's five-day academy in Johannesburg alongside entrepreneurs with different experience, countries and ambitions.

    About the academy
  4. COMPLETED
    04

    Engineering the KN-1

    Kin-Neon worked with engineers and an established Chinese equipment manufacturer to customise the prototype around intended Australian production, safety and quality requirements.

  5. LATEST COMPLETED
    05

    Factory testing and shipment

    The completed KN-1 prototype underwent final factory production testing before being shipped to Australia.

    Play the testing footage
  6. PLANNED
    06

    Materials development begins

    Begin Australian soil-recipe development and testing in-house with Ghanaian compressed-block construction partner Bricksave Constructions.

    About Bricksave
  7. PLANNED
    07

    Kin-Neon opens its doors

    Establish a working headquarters for materials development, prototype testing, production-system refinement, training and partnerships.

CompletedLatest completed milestonePlanned

TANGIBLE PROGRESS

The KN-1 prototype has moved from manufacture to the workshop.

These project clips document manufacturer testing in May 2026 and the machine's subsequent arrival at the workshop. They evidence prototype progress—not certified block performance or commercial production readiness.

CURRENT STAGE

A coordinated assessment comes before a build commitment.

Kin-Neon remains a development initiative. The next phase is to bring the right organisations together to assess community need, delivery structure, engineering, materials, approvals, training, funding and commercial feasibility.

  • Prototype and materials testing
  • Structural engineering and certification pathways
  • Field trials and system refinement
  • Delivery, training and manufacturing partnerships

PROVEN PRINCIPLES. A NEW AUSTRALIAN SYSTEM.

Proven elsewhere.
Re-engineered here.

Earth-based building is not an untested idea. Around the world, stabilised soil-block systems have delivered housing and public buildings while creating local production skills and livelihoods.

Kin-Neon does not claim that evidence as its own. It starts from those proven material principles and pushes the system further: controlled block production, precision geometry, modular connections, simpler assembly and future building intelligence.

A world-leading ambition, grounded in proof: make safe, high-quality housing easier and more affordable to produce under community control.
Cover of UN-Habitat's Economic Benefits of Stabilized Soil Block Technology in Sudan report
UN-Habitat publication
01

GLOBAL EVIDENCE

Hundreds of soil-block buildings. Thousands of people trained.

UN-Habitat reports more than 330 demonstration buildings and almost 3,000 people trained in stabilised soil-block production in Sudan.

Read the source
Cover of UN-Habitat's Interlocking Stabilised Soil Blocks publication
UN-Habitat publication
02

GLOBAL PRACTICE

Successful adoption depends on adapting the system locally.

UN-Habitat documents interlocking stabilised soil-block projects in Uganda, including their advantages, practical challenges and local lessons.

Read the source
Women involved in compressed earth brick construction in Nepal
World Habitat / Community Impact Nepal
03

COMMUNITY ENTERPRISE

Local block production can create homes and livelihoods.

A World Habitat-recognised program in Nepal combines compressed earth bricks, safer housing, local materials and rural micro-enterprise.

Read the source
Cover of the AIHW Closing the Gap targets report
Australian Institute of Health and Welfare
04

AUSTRALIAN NEED

The remote housing gap remains severe.

AIHW reports that 68% of First Nations people in Remote areas and 45% in Very remote areas lived in appropriately sized housing in 2021.

Read the source
Australian Government Closing the Gap 2025 report artwork
Australian Government
05

NATIONAL COMMITMENT

Remote housing and real jobs are national priorities.

The 2025 Closing the Gap Annual Report records more than 300 new houses in remote NT communities and 1,450 remote jobs created.

Read the source
National Indigenous Australians Agency remote Northern Territory housing investment graphic
National Indigenous Australians Agency
06

DELIVERY AT SCALE

Up to 2,700 homes over ten years in the Northern Territory.

The $4 billion remote housing agreement is being delivered with Aboriginal Housing NT, Land Councils and both governments across communities and town camps.

Read the source

A curated evidence feed from primary and specialist sources. Links open on the publisher's website.

PRACTICAL QUESTIONS

What organisations usually want to know.

Kin-Neon is a development initiative, so the responsible answer often depends on the community, location and agreed project scope. These are the principles guiding the work.

01Is Kin-Neon priced per house?

It can be, but that is not necessarily the best starting point. We prefer organisations to tell us what land, funding and priorities they have available.

We then work backwards with them to determine how that investment could create the greatest community value—including housing, local production capability, training, employment and infrastructure that remains useful after construction finishes.

02How long will delivery take?

Every project depends on its location, scale, approvals, services, materials and workforce. Once the local material recipe, batch processing and construction sequence are operating reliably, our target is a production rhythm capable of supporting up to one house per working day across the program.

Additional machines can increase production capacity, provided site works, crews, curing, transport, approvals and services scale with them. The entire delivery system—not one machine—determines the final output.

03How much skilled labour is required?

Kin-Neon is being designed to minimise reliance on scarce skilled labour without compromising safety or quality. Engineers, licensed trades and certifiers will still be required at specific stages.

With practical training, community members can participate in block production, assembly, logistics, measurement, quality control and maintenance. There are also valuable roles for Elders and others who prefer less physical work, including planning, coordination, checking, recording and knowledge sharing.

04Will the homes meet Australian building standards?

Every building must be engineered, approved and certified for its specific location. This includes structural performance, climate, wind or cyclone conditions, fire, moisture, termites, energy performance and essential services where applicable.

Local materials must also be tested and the block recipe validated before production begins. Kin-Neon does not replace the normal approval process—it is designed to make compliant construction more repeatable.

05Is this an experimental building method?

Compressed-earth and stabilised soil-block construction has been used successfully around the world for decades. Kin-Neon is developing an integrated Australian production and delivery system that combines those established principles with engineered foundations, modular roof connections, quality controls and local capability building.

We will clearly distinguish between proven construction methods and Kin-Neon components that are still undergoing testing, refinement or certification.

06Can the community choose what is built?

Yes. The model begins with the community's land, priorities, funding and decisions—not a predetermined catalogue of houses.

Standardised components make construction safer and more repeatable, but the project configuration can respond to local family needs, culture, climate, infrastructure and community objectives.

07Can local soil be used to make the blocks?

Potentially, but it must be tested first. Not every soil is suitable in its original form. The final recipe may combine local material with stabilisers, sand, aggregate or other inputs to achieve the required strength and durability.

Developing and controlling that local recipe is one of the most important early stages of each project.

08What remains in the community after the houses are built?

The objective is to leave more than completed buildings. Depending on the agreed delivery model, that may include trained people, production equipment, tested material recipes, documented quality systems, maintenance capability and a pathway to future community-led construction.

Ownership, governance and ongoing operation of those assets would be agreed before the project begins.

09What does Kin-Neon mean?

Kin-Neon means “moth” in Gathang, the language of the Birrbay, Warrimay and Guringay peoples.

The name represents transformation. For many moths, the cocoon protects the pupal stage—the period in which one form is reorganised into another. Emerging with what they need to fly is an outcome; the important part is the process that makes that change possible.

Kin-Neon applies the same idea to community development. It is not about turning a community into something else. It is about bringing together land, funding, knowledge, technology and local capability so the potential already within the community can emerge—self-directed and free to fly.

FOR LAND COUNCILS AND FUNDING BODIES

A housing investment should leave more than houses behind.

Review how Kin-Neon is intended to turn housing capital into homes, employment, training, equipment and lasting community capability - under community direction and through a staged, testable delivery model.

Providing your details is voluntary. The brief is available without them.